Laps between pieces should not be less than 100mm.
Slate roof edge details.
10 chalk your courses on the roof deck.
Do not chalk on the slates themselves.
Cover flashings are used where a felt or similar roof covering turns up against a wall.
Place the drip.
Code 4 lead sheet is normally used for this work and it is important that the length of each piece of flashing does not exceed 1 5m.
Install drip edges on the eaves first.
The drip edge also gives us a nice straight edge with which to align roof shingles slates or other roofing material.
Use roof jacks and planks.
When you install the drip edge over this strip it keeps the lower flange further from the home s siding which helps to keep water further from the home.
A furring edge is a strip of one by two wood you install on the vertical surface of the house just beneath the roof s edge.
Stage the roof properly.
The deciding factor upon which detail is to be used is the finished aesthetics that are chosen between the.
Nail fixing method 4 design considerations 4 environmental conditions 4 pitch of roof 5 minimum laps 6 batten sizes 6 underlay 6 ventilation requirements 6 fixing methods 6 types of nails 6 7 coverage of slates application details 8 eaves 9 verges 10 11 ridges 12 13 hips 14 15 valleys 16 17 abutments parapets 18 19 change of roof pitch mansards 20 21 vertical cladding 22 sitework.
Perimeter edge metal training and education take advantage of industry leading training and education though care the center for the advancement of roofing excellence.
9 do not walk on the slates during installation.
Install every course of slates along a permanent red chalk line chalked on the surface of the roof that marks the top edge of the slates.
With sloped roofs the general approach is to attach the flashing before the roofing is installed.
Aledora slate is a hollow back profile that when addressed properly is beneficial to the performance of the roof system.
Cad details document name pdf dwg download all cad construction details 37 1 mb 3 4 mb mc01 identification of roof areas 694 kb 167 kb mc01a single layer underlayment 678 kb 302 kb mc01b double layer underlayment 711 kb 322 kb mc02 vent pipe flashing 626 kb 349 kb mc03 valley.
The finish at the rake edge can be performed in different ways to conceal this structure of the slate.
Do not eyeball the.
The shingles slate or tile are placed over the flashing on the upper and two sides and slipped under the lower edge of the flashing.
Use a straight piece of batten to mark a line 25mm from the top edge of.
Drip edge varies in dimensions but typically the flange that nails to the roof surface is about 2 5 wide and the vertical edge that directs roof runoff down and away is about 1 5 in depth.
Slate roof central basic instructions on how to install slate roof hips and ridges slate roof central is your center hub for all things related to natural quarried slate roofing.