Refer to the rain carrying table in this booklet for the maximum allowable panel length per.
Shingle to metal roof transition detail.
Mc10 raised fascia.
Mark this point of the transition with a marking crayon.
String the line along the top of the frame until it meets the shingle roof.
Roofing multi ply sbs modified bitumen paradiene 20 30 rigid insulation.
Roof pitch the metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
Mc10b eave flush wall.
Conical pipe boot non split.
You see it provides an extra layer for covering your home.
Mc10a down slope eave details.
Coated metal roof edge.
Metal roofs over shingles help you insulate your house even better.
Tar will not fix the problem and will look like and when you do go back to fix the leak the tar will be heck to deal with.
Concealed wood equipment support.
Conical pipe boot split.
About press copyright contact us creators advertise developers terms privacy policy safety how youtube works test new features press copyright contact us creators.
Mc10d double lap tile.
Coated metal wall scupper.
Mc10c low slope ventilated eave detail.
Mc08a roof layout quick reference.
The trim and roofing sheet should be fastened every 12 to 24 inches along the gable edge.
To ensure you and your customers have the resources needed to get the job done we ve developed instructional videos that show your customers how to seamlessly integrate pitch transition trim with our high quality metal roof panels.
The best thing is it can reduce your cooling costs even more.
Repeat this step at the opposite side of the roof frame and.
Use the transition flashing made by the metal company and do it right.
The transition point can be a source of problems if not done correctly.
You can save on labor costs by putting metal roofs over shingles.
Mc09 suggested loading guide.
Coated metal joint detail.